ResetTriggeredEnum

Version Info

IntroducedDeprecatedUpdated
1.4  

Enumeration Literals

NameIntDepUpdDescription
ACTION_COMPLETE1.4 result of the Observation that is measuring an action or operation was reset upon completion of that action or operation.
ANNUAL1.4 result of the Observation was reset at the end of a 12-month period.
DAY1.4 result of the Observation was reset at the end of a 24-hour period.
MAINTENANCE1.4 result of the Observation was reset upon completion of a maintenance event.
MANUAL1.4 result of the Observation was reset based on a physical reset action.
MONTH1.4 result of the Observation was reset at the end of a monthly period.
POWER_ON1.4 result of the Observation was reset when power was applied to the piece of equipment after a planned or unplanned interruption of power has occurred.
SHIFT1.4 result of the Observation was reset at the end of a work shift.
WEEK1.4 result of the Observation was reset at the end of a 7-day period.

Back to top

Copyright © 2017-2026 Association for Manufacturing Technology (AMT). All rights reserved. MTConnect® is a trademark of AMT. Terms of Use.

MTConnect SysML Model V2.0