ResetTriggeredEnum

Version Info

IntroducedDeprecatedUpdated
1.4  

Enumeration Literals

NameIntDepUpdDescription
ACTION_COMPLETE1.4 Observation::result is measuring an action or operation was reset upon completion of that action or operation.
ANNUAL1.4 Observation::result was reset at the end of a 12-month period.
DAY1.4 Observation::result was reset at the end of a 24-hour period.
MAINTENANCE1.4 Observation::result was reset upon completion of a maintenance event.
MANUAL1.4 Observation::result was reset based on a physical reset action.
MONTH1.4 Observation::result was reset at the end of a monthly period.
POWER_ON1.4 Observation::result was reset when power was applied to the piece of equipment after a planned or unplanned interruption of power has occurred.
SHIFT1.4 Observation::result was reset at the end of a work shift.
WEEK1.4 Observation::result was reset at the end of a 7-day period.

Back to top

Copyright © 2017-2026 Association for Manufacturing Technology (AMT). All rights reserved. MTConnect® is a trademark of AMT. Terms of Use.

MTConnect SysML Model V2.6